| D1007048 Interim Decision Implementing Methods to Decrease the Number of Gas & Electric Service Disconnections |
135698 bytes |
7/30/2010 |
| D1007048 Attachment A |
69058 bytes |
7/30/2010 |
| PD by ALJ Kim Providing Guidance to SMJU's Expenditure of 2010-2011 LIEE ME&O 5-4-10 |
164810 bytes |
5/4/2010 |
| Assigned Commissioner & Assigned ALJ Judges Joint Update Scoping Memo and Ruling |
135593 bytes |
1/20/2010 |
| ALJ Kim Ruling Seeking Comment on the Proposed Further Update Statewide LIEE Policy & Procedure Manual |
138061 bytes |
12/16/2009 |
| Attachment to ALJ Kim Ruling Seeking Comment on the Proposed Further Update Statewide LIEE Policy & Procedure Manual |
1062907 bytes |
12/16/2009 |
| ALJ Kim Ruling Granting Further Extension of Time to File Annual Estimate of CARE Eligibility |
81004 bytes |
12/2/2009 |
| ACR Requesting Applications for Appt of Two Public Pos of the LIOB |
184923 bytes |
11/17/2009 |
| Chief ALJ Ruling ReOpening and Reassigning the Proceeding to Provide Futher Direction to the SMJU re ME&O FY 2010-2011 |
86107 bytes |
9/21/2009 |
| ALK Kim's Ruling Providing Additional Guidance on the Interim Direction Regarding Expenditure of LIEE ME&O Budgets for 2010 |
138061 bytes |
9/14/2009 |
| ALK Kim's Ruling Providing Interim Direction Re Expenditure of LIEE ME& O Budgets for 2010 |
229418 bytes |
8/28/2009 |
| ACR Requesting Applications for 2 Public Pos and 1 Contractor Pos for the LIOB |
131166 bytes |
6/23/2009 |
| D09-06-026 ALK Kim's Decision Clarifying and Modifying Decision 08-11-031 Three Measure Rule and Augmenting One-E- App |
164330 bytes |
6/19/2009 |
| ALJ Kim Update Ruling on Comment and Workshop Schedule re ED's Draft WNA White Paper and Setting Public Workshop |
26112 bytes |
6/12/2009 |
| Draft Whole Neighborhood Approach White Paper Energy Division Final |
181248 bytes |
6/5/2009 |
| ALJ Kim's Ruling Seeking Comment on the Draft LIEE P&P Manual |
102117 bytes |
6/2/2009 |
| ALJ Kim's Ruling Seeking Comment on the ED Draft Whole Neighborhood Approach |
610232 bytes |
6/2/2009 |
| ALJ Kim PD Clarifying and Modifying D 08-11-031 Modified Three Measure Min Rule and Augmenting One-E- App |
728684 bytes |
5/15/2009 |
| 2009-2010 Income Eligibility Guidelines - Large Utilities |
714428 bytes |
4/28/2009 |
| 2009-2010 Income Eligibility Guidelines - Small Utilities |
983766 bytes |
4/28/2009 |
| Joint ACR of Commissioner Grueneich and ALJ Kim Concerning Clarification of D08-11-030 |
78619 bytes |
3/20/2009 |
| Notice of Reassignment from ALJ Thomas to ALJ Kim |
59217 bytes |
12/19/2008 |
| ACR Inviting Applications for Appointment to the LIOB 12-18-08 |
52224 bytes |
12/18/2008 |
| Decision 0812019 SMJU 2009-2011 LIEE and CARE Applications |
231713 bytes |
12/8/2008 |
| Decision 08-11-031 Large IOUs 2009-2011 LIEE and CARE Applications |
681342 bytes |
11/10/2008 |
| Decision 08-11-031 Attachments A-o |
190220 bytes |
11/10/2008 |
| ALJ Thomas Proposed Decision on SMJU 09-11 LIEE and CARE Applications |
359112 bytes |
10/31/2008 |
| ACR Inviting Applications for Appointment to the LIOB 10-28-08 |
214618 bytes |
10/28/2008 |
| ALJ Thomas Attachment A to PD on Large IOUs 09-11 LIEE and CARE Applications |
205352 bytes |
9/16/2008 |
| ALJ Thomas PD on Large IOUs 09-11 LIEE and CARE Applications |
818246 bytes |
9/16/2008 |
| ALJ Thomas Fifth Ruling Seeking IOU Data CARE LIEE |
25600 bytes |
9/3/2008 |
| Proposed Decision of Commissioner Grueneich Adopting the CA Long Term EE Strategic Plan |
640299 bytes |
8/19/2008 |
| Attachment A to PD of Commissioner Grueneich Adopting the CA Long Term EE Strategic Plan |
2475854 bytes |
8/19/2008 |
| ALJ Scoping Memo and Ruling Consolidating Proceedings |
181943 bytes |
7/16/2008 |
| ALJ Thomas 3rd Ruling Seeking Further Info on Large IOU's 2009-2011 LIEE-CARE App |
574159 bytes |
7/16/2008 |
| Letter of Commissioner Grueneich on Energy Efficiency Strategic Plan |
58153 bytes |
7/15/2008 |
| Attachment to ACR and ALJ Ruling Regarding Initial Schedule on Strategic Plan |
1416925 bytes |
7/14/2008 |
| Order Instituting Rulemaking to Develop the Commission's Energy Efficiency Strategic Plan |
67207 bytes |
7/14/2008 |
| ACR and ALJ Ruling Regarding Initial Schedule on Strategic Plan |
630994 bytes |
7/14/2008 |
| Notice of Assignment R08-07-011 Assigned to Commissioner Grueneich and ALJ Gamson |
572008 bytes |
7/14/2008 |
| D 08-06-029 Granting in Part and Otherwise Denying Petition for Modification of D06-01-024 |
92225 bytes |
6/26/2008 |
| ALJ Thomas Second Ruling Seeking Further Info on Large IOUs 2009-2011 LIEE & CARE app |
705930 bytes |
6/25/2008 |
| ALJ Ruling Seeking Information on IOUs 09-11 LIEE - CARE app |
126909 bytes |
6/17/2008 |
| Attch A to ALJ Ruling re Information from IOUs on 09-11 LIEE - CARE app |
100572 bytes |
6/17/2008 |
| Commissioner Grueneich's Ruling Directing the IOUs to Comply with Commission Directives |
589650 bytes |
6/13/2008 |
| ALJ Thomas Notice of Hearing |
88607 bytes |
5/19/2008 |
| ACR Providing Guidance to SMJUs Attachment A |
493338 bytes |
5/2/2008 |
| ACR Providing Guidance to SMJUs Attachment B |
508481 bytes |
5/2/2008 |
| ACR Providing Guidance to the SMJUs on CARE and LIEE 09-11 Budget Appl |
462966 bytes |
5/2/2008 |
| Commissioner Grueneich's Notice of Public Meeting for the WE&T |
469200 bytes |
4/11/2008 |
| Notice of re-assignment to ALJ Thomas |
58694 bytes |
4/7/2008 |
| ACR Providing Guidance for the Low Income EE 2009-2011 Budget Appl |
523842 bytes |
4/1/2008 |
| Order Addressing Net Energy Metering Feb 15 08 |
93978 bytes |
2/15/2008 |
| ALJ Malcolm's Ruling Scheduling Workshop |
819640 bytes |
2/7/2008 |
| Atchmnt A to Ruling Feb 7 |
877523 bytes |
2/7/2008 |
| ACR Granting Ext to File Preliminary Strategic Plan Feb 4 08 |
1250948 bytes |
2/4/2008 |
| Opinion Adopting Self Generation Incentive for 2008 |
81884 bytes |
2/1/2008 |
| Opinion Modifying D06-08-028 |
122842 bytes |
2/1/2008 |
| Opinion Denying Petition by FuelCell Energy to Modify D0412045 |
1272250 bytes |
1/15/2008 |
| ALJ Ruling Noticing Issuance of CEC Solar Incentive Guidelines |
1210756 bytes |
1/15/2008 |
| Attachment to Decision 07-12-051 |
1256343 bytes |
12/24/2007 |
| Decision 07-12-051 Program Goals 2009-2011 |
307934 bytes |
12/24/2007 |
| Commissioner Grueneich and ALJ Malcolm PD Providing Direction for LIEE Policy Objective, Goals, Strategic Planning and the 2009-2011 and AB 2140 |
1680559 bytes |
11/19/2007 |
| Commissioner Peevey's D07-11-045 Establishing Single-Family Low-Income Incentive Progam Within the CSI |
224714 bytes |
11/19/2007 |
| Opinion Granting Intervenor Compensation to CA for Renewable Energy, Consumer Federation of CA and Green Power Institute for Contribution to CSI |
1410292 bytes |
11/11/2007 |
| ALJ Duda's Ruling Requesting Comments on 2008 Self Generation Incentive Program Budget |
1248890 bytes |
10/26/2007 |
| Commissioner Grueneich's Interim Opinion on Issues Relating to Future Savings Goals and Program Planning for 2009-2011 EE and Beyond |
454528 bytes |
10/19/2007 |
| Commissioner Peevey's PD Stablishing Single-Family Low-Income Incentive Program within the CSI |
1411267 bytes |
10/17/2007 |
| Commissioner Grueneich's Ruling Inviting Applications for Appointment to the LIOB |
1249946 bytes |
10/15/2007 |
| Decision of ALJ Malcolm regarding ACCES and A WISH Motion to Extend deadline |
33792 bytes |
10/1/2007 |
| Attachments to ALJ Malcolm's Ruling Seeking Comments on Issues Raised in the KEMA report and on NGAT Issues |
1394456 bytes |
9/27/2007 |
| ALJ Malcolm's Ruling Seeking Comments on Issues Raised in the KEMA report and on NGAT Issues |
1279989 bytes |
9/27/2007 |
| Commissioner Grueneich's Interim Opinion on Phase 1 Issues Shareholder RiskReward Incentive Mechanism for EE Programs |
538433 bytes |
9/20/2007 |
| Commissioner Grueneich's Interim Order on Issues Relating to Future Savings Goals and Program Planning for 2009-2011 EE and Beyond |
1384158 bytes |
9/19/2007 |
| ALJ Malcolm's Ruling Seeking Responses to Questions on Furnace Programs and NGAT |
1269569 bytes |
9/14/2007 |
| PD of Commissioner Peevey Opinion Establishing a Research, Development, Demonstration and Deployment Plan for hte CA Solar Initiative |
1344782 bytes |
8/7/2007 |
| ACR Grueneich's Extending Deadline for LIOB Applicants |
874178 bytes |
8/1/2007 |
| Commissioner Peevey's PD Modifying D 06-08-028 Re Metering Accuracy and Monitoring Requirements |
1296216 bytes |
6/26/2007 |
| Commissioner Grueneich's Ruling Correcting 6-4-07 Requesting Appl for Appointment to the LIOB |
869612 bytes |
6/11/2007 |
| Commissioner Grueneich's ACR Inviting Applications for Appointment to the LIOB |
882752 bytes |
6/4/2007 |
| ALJ Malcolm's Ruling Addressing Renters Access to LIEE Programs AB 2104 |
831284 bytes |
5/21/2007 |
| ALJ's Duda On Notice of Intent to Claim Compensation by a World Institute for a Sustainable Humanity |
1211925 bytes |
5/14/2007 |
| ALJ Malcolm's Ruling on Notice of Intent to Claim Compensation by A WISH |
1211925 bytes |
5/14/2007 |
| ALJ Malcolm's Ruling Finding Greelining, World Institute, TURN, Disability Rights and LIF eligble to Claim Compensation |
1324583 bytes |
5/10/2007 |
| ALJ Malcolm's Draft Opinion Granting Petitions to Modify D 06-12-038 to Delay Competitive Bid Process |
1267615 bytes |
5/8/2007 |
| ACR Peevey's Finalizing Section 3.2 of CA Solar Initiative Program Handbook |
1212566 bytes |
5/2/2007 |
| ALJ Malcolm's Ruling Shortening the Time to Respond to Petition to Modify D06-12-038 |
1207328 bytes |
4/11/2007 |
| Commissioner Grueneich's Scoping Ruling on the LIEE Programs of CA Energy Utilities |
858953 bytes |
3/28/2007 |
| OIR - Regarding Policies, Procedures and Rules for the LIEE Programs 1-31-07 |
138794 bytes |
1/31/2007 |
| SCE Letter to Larson Re Typo Errors in D 06-12-038 |
161556 bytes |
1/18/2007 |
| ALJ Malcolm's Draft OIR Regarding Policies, Procedures and Rules for the LIEE Programs of CA Energy Utilites |
133632 bytes |
1/16/2007 |
| D0612038 Appendix of Order Adopting Utility Budgets for LIEE and CARE Programs |
19570 bytes |
12/15/2006 |
| D0612036 Appendix of Order Adopting Small Utility Budgets for Admin LIEE and CARE Programs |
12724 bytes |
12/15/2006 |
| D0612036 Order Adopting Small Utility Budgets for Admin of LIEE and CARE Programs |
103831 bytes |
12/15/2006 |
| D0612038 Order Adopting Utility Budgets for LIEE and CARE Programs |
266506 bytes |
12/15/2006 |
| Appendix to ALJ's Malcolm PD Adopting Utility Budgets for LIEE Programs and CARE 11-14-06 |
1233254 bytes |
11/14/2006 |
| ALJ Malcolm's PD Adopting Utility Budgets for Low Income Energy Efficiency Programs and California Alternate Rate for Energy 11-14-06 |
1543923 bytes |
11/14/2006 |
| Appendix to ALJ's Malcolm PD Adopting Small Utility Budgets Admin for LIEE and CARE |
1207270 bytes |
11/14/2006 |
| ALJ Malcolm's PD Adopting Small Utility Budgets for Administration of LIEE and CARE Programs 11-14-06 |
1322143 bytes |
11/14/2006 |
| Assigned Commissioner's Scoping Memo and Ruling Affirmng the schedule for the proceeding, addresses the scope of hearing and other procedurla matters |
1259680 bytes |
9/1/2006 |
| Draft Decision of ALJ Weissman Denying the Petition of the Western Manufactured Housing Community Association |
1313004 bytes |
8/28/2006 |
| Opinion Approving Augmentation to the 06 LIEE Prgrm Budget of PG&E and addressing the compliance filings of SDG&E SCG and SCE |
76288 bytes |
8/24/2006 |
| Commissioner Grueneich N ALJ Malcolm Assigned Commissioner's Scoping Memo and Ruling Rescheduling dates for filing comments |
1265826 bytes |
8/15/2006 |
| ALJ Malcolm's Notice Resetting Date of Telephonic Prehearing Conference |
33280 bytes |
8/10/2006 |
| ALJ Weissman Ruling Consolodating Dockets and Setting a Tentative Schedule |
542123 bytes |
7/24/2006 |
| ALJ Malcolm Draft Decision Approving Augmentation to the 2006 LIEE Program Budget |
602072 bytes |
7/10/2006 |
| Commissioner Grueneich's ACR Inviting Application for Appointment to the LIOB |
51200 bytes |
6/30/2006 |
| D0604011 Response to the Petition for Modification of D 0507014 Filed by Golden State Water Co |
61402 bytes |
4/14/2006 |
| D0604001 Order Correcting Error in Decision 05-12-026 |
144670 bytes |
4/4/2006 |
| Attachment to ACR Approving the Proposals Contained in the November 1, 2005 Report on the Standardization Team |
566488 bytes |
3/29/2006 |
| Commissioner Grueneichs's ACR Approving the Proposals Contained in the 11-1-05 Report of the Team as Modified |
51200 bytes |
3/26/2006 |
| Draft Decision of ALJ Weissman Responding to the Petition for Modification of D05-07-014 filed by Golden State Water Co |
94208 bytes |
3/14/2006 |
| Decision 06-02-011 Denying the Petition of Tecogen, Inc for Modification of D04-12-045 |
56832 bytes |
2/17/2006 |
| Decision 06-02-014 Opinion Denying the Petition of the SCE Company for Modification of D05-10-044 |
75586 bytes |
2/16/2006 |
| ALJ Malcolm Ruling Scheduling Workshop on PBI for the CA Solar Intitiatve Program |
41984 bytes |
2/3/2006 |
| ALJ Weissman Ruling Concerning Pending and Future Pleading and Future Filings |
36352 bytes |
1/18/2006 |
| ALJ Weissman Draft Decision Denying the Petition of SCE for Modification of D 05-10-044 |
87327 bytes |
1/17/2006 |
| Commissioner Grueneich's ACR Inviting Applications for Appt to the LIOB 1-5-06 |
48128 bytes |
1/5/2006 |
| ALJ Weissman's Ruling on Several Notices of Intent to Request Compensation |
57856 bytes |
12/28/2005 |
| Decision 05-12-026 Opinion Approving 2006-2007 LI Programs and Funding for the Larger Energy Utilities and Approving New LIEE Program Measures for 200 |
316656 bytes |
12/15/2005 |
| ALJ Malcolm Interim Order Adopting Policies and Funding for the CA Solar Initiative 11-15-05 |
83445 bytes |
11/15/2005 |
| ALJ Weissman Opinion Approving 06-07 LI Programs and Funding for the Larger Energy Utilities and Approving New LIEE Program Measures for 06 |
592896 bytes |
11/15/2005 |
| ALJWeissman D05-10-044 Approving Various Emergency Program Changes in Light of Anticipated High Natural Gas Prices in Winter of 05-06 |
164352 bytes |
11/7/2005 |
| Draft Resolution G-3383 CEC Requesting Approval of its 2006 Program Plan and Funidng request for the Natural Gas Public Interest Research Program |
98816 bytes |
11/1/2005 |
| Draft Decision of ALJ Weissman Interirm Opinion Approving Various Emerncy Program Changes in Light of Anticipated High Natural Gas Prices in the Winte |
140800 bytes |
10/25/2005 |
| ALJ Weissman's directing Utility Respondents on Utility Information Requirements |
34304 bytes |
10/14/2005 |
| Commissioner Grueneich's Adoption of a CPUC Policy Statement on Greenhouse Gas Emissions Performance Std |
27648 bytes |
10/7/2005 |
| ALJ Weissman Ruling Setting A Schedule for Comments on the Assessment of PRoposed New Program Year 2006 Measures 9-1-05 |
38912 bytes |
9/1/2005 |
| ALJ Weissman Notice of Public Participation Hearing |
40960 bytes |
9/1/2005 |
| ALJ Weissman Ruling re Low Income Rulemaking and Cosolidated Dockets |
31232 bytes |
8/9/2005 |
| ALJ Weissman Decision 05-07-014 Approving the 2005 Budgets for seven SMJU's to Implement CARE and LIEE Programs |
578048 bytes |
7/25/2005 |
| Decision 05-07-007 Order Correcting Error in D05-05-19 |
168448 bytes |
7/18/2005 |
| ALJ Weissman Ruling Consolidating Various Matters and Seeting a Schedule for Comments 7-14-05 |
49664 bytes |
7/14/2005 |
| ALJ Weissman Ruling Granting SoCalGas Motion for leave to complete the noticing of application out of time |
45568 bytes |
7/12/2005 |
| ALJ Thomas & Weissman's Ruling Granting SCG Motion for Leave to Complete the Noticing of Application out of Time |
45568 bytes |
7/12/2005 |
| ALJ Weissman Ruling in Response to the Notice of Intent of the Ass for CA Community and Energy Services to Claim Compensation |
59904 bytes |
7/8/2005 |
| Motion of SCG for leave to exced the 34 day tiem limit for notifying customer of 2 rate change |
199168 bytes |
7/8/2005 |
| Draft Decision of ALJ Weissman Approving LIEE & CARE Programs for 2005 for PacifiCorp, SWG, Sierra Pacific, Avista Corp, Bear Valley, Alpine and West |
586752 bytes |
6/21/2005 |
| Attachment to Commissioner's Grueneich's ACR Approving Proposed Amendments for Phase 5 |
5500874 bytes |
6/7/2005 |
| Commissioner Grueneich's ACR Approving Proposed Amendments to the Workplan, Budget & Schedule for Phase 5 of the LIEE Standardization Project |
49152 bytes |
6/7/2005 |
| D 05-05-019 ALJ Thomas Ruling Correcting Errors in Decision 05-04-052 |
338944 bytes |
5/16/2005 |
| Commissioner Grueneich's ACR Inviting Applications for Appointment to the LIOB |
45568 bytes |
5/10/2005 |
| ALJ Weissman Ruling Releasing Energy Division's Report on SMJUs Funding for 2005 LI Programs |
49152 bytes |
4/29/2005 |
| ALJ Weissman Ruling Attachment A |
933376 bytes |
4/29/2005 |
| ALJ Thomas Interim Decision Approving 05 LIEE and CARE Programs for the Utilities 4-27-05 |
816640 bytes |
4/27/2005 |
| Decision Adopting New Unversal Lifeline Telephone Service Certificatin and Verification Processes |
170496 bytes |
4/8/2005 |
| ACR Ruling-Grueneich & Weisman Directing the Standardization Team to Withdraw & Refile its proposal related to Phase 5 of the LIEE Standardization Pr |
52224 bytes |
3/25/2005 |
| Draft Decision of ALJ Thomas Approving 2005 LIEE and CARE Programs for PG&E, SCE, SCG and SDG&E |
952320 bytes |
3/22/2005 |
| ALJ Thomas Granting Request for Extension to LIOB |
50176 bytes |
3/15/2005 |
| LIOB Request for Extension to file comments on the Standardization Team's P&P and WIS |
145408 bytes |
3/9/2005 |
| ALJ Minkin ReAssignment of R04-01-006 to ALJ Weissman |
48128 bytes |
2/23/2005 |
| ALJ Thomas Ruling re Revisions to LIEE Program Appendix A |
3543766 bytes |
2/11/2005 |
| ALJ Thomas Ruling re Revisions to LIEE Program & Policy Manual & WIS Standards Manual |
51200 bytes |
2/11/2005 |
| ALJ Thomas Data Request to SMJUs Attachment dated 12-22-04 |
14179474 bytes |
12/22/2004 |
| ALJ Thomas Data Request to SMJUs re 2005 LIEE and CARE Proposals dated 12-22-04 |
32768 bytes |
12/22/2004 |
| ALJ Thomas Second Ruling Re AB 868 dated 11-22-04 |
56320 bytes |
11/22/2004 |
| ACR Wood Approving a Workpaln Budget and Schedule for Phase 5 of the LIEE Standardization Project dated 10-22-04 |
134144 bytes |
10/22/2004 |
| ACR Wood Requiring an early start to phase 5 of the LIEE Program Standardization Project 10-1-04 |
37376 bytes |
10/1/2004 |
| ALJ Thomas Ruling seeking input regarding AB 868 CARE Program Eligibility for Migrant Housing Centers 10-1-04 |
72704 bytes |
10/1/2004 |
| Amendment to ALJ Thomas Ruling Consolidating Apps for PY 2005 LIEE and CARE dated 9-27-04 |
27136 bytes |
9/30/2004 |
| ALJ Thomas Ruling Consolidating Applications FY 2005 LIEE and CARE for Energy Programs of SMJU & Large IOU's and addressing LIOB Membership |
65536 bytes |
9/27/2004 |
| ALJ Bushey Setting Schedule for Assessing Alternative Proposal for LI Residents 9-23-04 |
30720 bytes |
9/23/2004 |
| ACR Wood Revising the due date for the final report on ED audit of PG&E's LIEE Program 9-17-04 |
28160 bytes |
9/17/2004 |
| ACR and ALJ Bushey Ruling concluding consideratin of Initial Proposal and Directing parties to address alternative proposal for LI residents 8-25-04 |
55808 bytes |
8/25/2004 |
| Decision 04-08-010Commissioner Lynch-ALJ DeBerry Implementation of AB 1002 Establishing a Natural Gas Surcharge |
199168 bytes |
8/23/2004 |
| AB 868 Parra - Migrant Farm Labor Centers |
21824 bytes |
8/16/2004 |
| ALJ Thomas Ruling Granting Petition to Intervene of Conard House dated 8-12-04 |
28160 bytes |
8/12/2004 |
| Resolution E-3885 SCE Requests approval for establishing Cool Centers dated 7-20-004 |
75776 bytes |
7/20/2004 |
| Scoping Memo from ALJ Thomas and Commissioner Wood Proposed Policies and Programs Governing Post 2003 Low Income Assistance Programs 6-24-04 |
113664 bytes |
6/24/2004 |
| ACR Wood Modifying the Schedule and Due Date for ED Report on Audit of the CARE for Energy Program Admin Expenses 6-22-04 |
34304 bytes |
6/22/2004 |
| Commissioner Lynch's Proposed Decision Implementation of AB 1002 Establishing a Natural Gas Surcharge |
246784 bytes |
5/28/2004 |
| ACR Wood Establishing Provisiongs for CARE Automatic Enrollment Dated 5-5-04 |
89600 bytes |
5/11/2004 |
| ACR Wood Approving a Revised Schedule for Completing the Low Income Energy Needs Assessment Study Dated 5-5-04 |
42496 bytes |
5/11/2004 |
| ALJ Thomas Ruling regarding Latino Issues Forum's Notice to Claim Compensation dated 4-5-04 |
30720 bytes |
4/13/2004 |
| Comm Wood and ALJ Thomas Ruling Approving Revisions to the Statewide Policies and Procedures & Weatherization Installation dated 3-23-04. |
119296 bytes |
12/31/2003 |
| D 03-11-020 Interim Opinion Phase 4 Standardization Result for LIEE Measure Cost Effectiveness and NGAT |
418816 bytes |
12/31/2003 |
| D 0311020 Attachments 2-7 |
5769696 bytes |
12/31/2003 |
| ALJ Thomas Ruling setting prehearing conference and requiring the filing of statements dated 3-24-04 |
34304 bytes |
12/31/2003 |
| ALJ Gottstein Ruling closing Rulemaking R01-08-027 dated 1-13-04 |
82432 bytes |
12/31/2003 |
| D03-12-016 2004 Low Income EE Programs for SMJU |
397824 bytes |
12/23/2003 |
| Joint ACR Wood and ALJ Ruling Bushey dated 10-21-03 |
38912 bytes |
12/16/2003 |
| ACR Wood Modifying Due Date for CO Testing Per D03-11-020 dated 12-3-03 |
34304 bytes |
12/9/2003 |
| Draft Decision ALJ Gottstein 2003 LIEE Programs for SMJU & Planning Process for 2005 LI Assistance 11-4-03 |
410112 bytes |
11/4/2003 |
| D02-10-058 San Gabriel Valley Water Company 10-31-02 |
414208 bytes |
10/24/2003 |
| Joint ACR Wood with ALJ Bushey re San Gabriel Water Co Prehearing Conference 10-21-03 |
38912 bytes |
10/24/2003 |
| ACR Wood Seeking Comments on the Energy Division Evaluates & Recommends Improvements on the LIEE Programs 10-2-03 |
130560 bytes |
10/10/2003 |
| ACR Wood Revising the due date for the Final Report on ED Audit of PG&E's LIEE Program 10-2-03 |
31232 bytes |
10/10/2003 |
| ALJ Gottstein Interim Opinion Phase 4 Standardization Results for LIEE Measure Cost Effectiveness & Natural Gas Appliiance Testing 10-10-03 |
480256 bytes |
10/10/2003 |
| ALJ Malcolm Ruling Approving the Program Implementation Plan of the City of SF and PG&E 8-20-03 |
44032 bytes |
9/30/2003 |
| ACR Wood Augmentation of the Budget for LIEE Standardization Project 8-18-03 |
112640 bytes |
8/19/2003 |
| ACR Wood Revising Due Date for Final Report on ED audit of the CARE Admin Expenses dated July 16, 2003 |
52224 bytes |
8/5/2003 |
| ACR Wood Re-Opening Period to Receive Applications from Persons Interested in serving on the LIOB dated July 8, 2003 |
32256 bytes |
8/5/2003 |
| ACR Lynch -Wood Requesting comments on shareholder earning continuation & requesting tables May 6, 2003 |
68608 bytes |
6/19/2003 |
| ALJ DeBerry Ruling Sets PreHearing Conference for AB 1002 Implementation dated Jan 3, 2003 |
32768 bytes |
6/19/2003 |
| Decision 03-02-023 Compensation to LIF/Greenlining |
80896 bytes |
6/19/2003 |
| Decision 03-04-027 SDG&E Revenue Allocation Proceeding orders separate balancing accounts for Low Income PPP |
56832 bytes |
6/19/2003 |
| Decision 03-01-037 Approves higher baseline for common area accounts |
109568 bytes |
6/19/2003 |
| ALJ Gottstein Ruling Consolidating 3 years of AEAPs dated Jan 24, 2003 |
44032 bytes |
6/19/2003 |
| ALJ Malcolm Ruling Denying the Motion of WEM and Denying PG&E Motion to Quash dated March 19, 2003 |
45056 bytes |
6/19/2003 |
| ALJ DeBerry Ruling Excusing Alpine from AB 1002 Proceeding dated April 8, 2003 |
30208 bytes |
6/19/2003 |
| ALJ Gottstein Ruling Schedule & Need for Hearings on Low Income EE Earning Claims dated April 15, 2003 |
36864 bytes |
6/19/2003 |
| ALJ DeBerry Ruling Eligibility for Compensation to LIF & NRDC dated April 30, 2003 |
42496 bytes |
6/19/2003 |
| Decision 03-05-003 Closes PY 2000 Proceeding |
25600 bytes |
6/19/2003 |
| ALJ Ruling DeBerrry Excusing Southwest Gas from AB 1002 Proceeding dated May 7, 2003 |
35840 bytes |
6/19/2003 |
| ALJ DeBerry Ruling Excuses West Coast & Avista from AB 1002 dated Feb 20, 2003 |
31232 bytes |
6/19/2003 |
| ACR Wood Phase 4 Budget and Task Augmentation dated Jan 28, 2003 |
216064 bytes |
6/19/2003 |
| Decision 03-06-027 Interim Opinion Revisions to the Low Income EE Program Weatherization Installation Standards & Policy & Procedures |
34304 bytes |
6/19/2003 |
| ACR Wood Schedule for Phase 4 dated Feb 24, 2003 |
118784 bytes |
6/19/2003 |
| Decision 03-03-007 PY 2003 for SMJU |
839168 bytes |
6/19/2003 |
| ALJ Gottstein Ruling Schedule and Scope for AEAP dated March 19, 2003 |
111616 bytes |
6/19/2003 |
| ACR Lynch AB 1002 Rulemaking Scope & Schedule dated April 22, 2003 |
70144 bytes |
6/19/2003 |
| ACR Wood Revising Due Dates for the Final Reports on LIEE Measure Assessment and Audit of CARE Admin Expenses |
33792 bytes |
6/4/2003 |
| ACR Commissioner Wood Ruling Increasing the Budget for Phase 2 of the Low Income Energy Needs Assessment |
43520 bytes |
6/4/2003 |
| ACR Wood Revising Due Date for Final Rprt on LIEE and ED Audit for CARE Prgm Admin Expns 4-8-03 |
34304 bytes |
4/9/2003 |
| ACR Wod re Updated Care Penetration Rates 12-27-02. |
38912 bytes |
4/1/2003 |
| ALJ Gottstein Requesting Comment on Standardization Team's Propsed Revision to WIS manual 3-18-03 |
36352 bytes |
3/19/2003 |
| ACR Wood Revising Due date for ED report on the Audit of CARE Admin Expenses March 7,03 |
32256 bytes |
3/19/2003 |
| D03-02-070 Scope - Scedule for CARE-LIEE Program Eval. |
123904 bytes |
3/3/2003 |
| ACR Establishing LIOB Nov 20, 2001 |
70144 bytes |
2/28/2003 |
| Decision 030102 Phase 2 of the Low Income Needs Assessment Study |
110592 bytes |
1/24/2003 |
| D 0301035 Denying Fones4All's Amended Petition to Modify D 0010028 and Modifying ULTS Admin Expense |
165888 bytes |
1/24/2003 |
| ALJ Gottstein Ruling Motion to Intervene and Eligibility for Compensation of Greenlining 9-27-02 |
50176 bytes |
12/31/2002 |
| OIR on the Establishment of a Public Purpose Program Surcharge Pursuant to AB 1002 10-8-02 |
60928 bytes |
12/31/2002 |
| Decision 02-12-019 PY 2003 LIEE Programs and Budgets 12-6-02 |
564736 bytes |
12/31/2002 |
| ALJ DeBerry Ruling AB 1002 Extension of Comment Period 10-30-02 |
26624 bytes |
12/31/2002 |
| ALJ DeBerry Ruling Excussing SCE from R02-01-001 11-15-02 |
27136 bytes |
12/31/2002 |
| ALJ DeBerry Ruling Excusing Respondents from providing information and granting request of mountain utilities 10-25-02 |
27648 bytes |
12/31/2002 |
| Resolution G-3340 PG&E LIEE Program Funding 9-19-02 |
77312 bytes |
12/31/2002 |
| ACR on CARE Program Evaluations 9-27-02 |
44032 bytes |
12/31/2002 |
| ACR Postponing Utility Data Submission Date for Auto Enrollment 10-9-02 |
29696 bytes |
12/31/2002 |
| ACR Regarding Updated CARE Penetration Rates 12-27-02 |
38400 bytes |
12/31/2002 |
| ACR Wood Extending Due Date for the Augmentation of A02-07-001-004 Sep 17,02 |
31232 bytes |
9/17/2002 |
| Decision 02-09-021 Opinion Adopting PY2002 CARE Budgets for PG&E, SDG&E, SCE & SoCal Gas |
270848 bytes |
9/5/2002 |
| Dec 02-08-078 Order Correcting Clerical Error in D 02-08-034 |
22016 bytes |
8/26/2002 |
| Resolution L 301 Low Income Oversight Board Funding August 22,02 |
53248 bytes |
8/22/2002 |
| Decision 02-08-051 Low Income Assistance Programs for Alpine, Mountain Utilities West Coast Gas |
169472 bytes |
8/22/2002 |
| ACR Com Wood Establish Category and Providing Scoping Memo Aug 21, 2002 |
29696 bytes |
8/21/2002 |
| ACR Com Wood Directing PG&E to Respond to Emergency Motion Re suspension of LIEE Weatherization Program Aug 20, 02 |
31744 bytes |
8/20/2002 |
| ACR Com Wood Postponing Bill Inserts for Auto Enrollment Aug 13, 2002 |
23040 bytes |
8/13/2002 |
| Dec 02-08-34 LIEE Program & Measure Cost-Effectiveness Testing Aug 8,02 |
89088 bytes |
8/8/2002 |
| ALJ Gottstein Ruling Consolidates Appl for PY03 Low Income Asst program of Large Utilities Aug 7, 02 |
27136 bytes |
8/7/2002 |
| ALJ Gottstein Rulin Consolidating Appl PY03 Low Income Assistance Programs Applications of SMJU Aug 7,02 |
27648 bytes |
8/7/2002 |
| Decision 02-07-033 Attachments 3-6 July 22,02 |
23552 bytes |
7/22/2002 |
| Attachment 7 to Decision 02-07-033 |
41984 bytes |
7/22/2002 |
| Attachment 1 to Decision 02-07-033 |
20992 bytes |
7/22/2002 |
| Dec 02-07-033Status of Rapid Deployment, CARE Penetration Goals Automatic Enrollment & Related issues Jul 22,02 |
174592 bytes |
7/22/2002 |
| Table 1 of Decision 02-07-033 July 22,02 |
18944 bytes |
6/22/2002 |
| R0108027_Gottstein_Ruling |
32768 bytes |
6/13/2002 |
| ACR Com Wood PY 2002 Scoping Memo and Ruling |
30208 bytes |
5/30/2002 |
| ACR Wood Solicits Comments on Draft 1 Needs Assessments & Adds Phase 2 Study Task May 9,02 |
51712 bytes |
5/9/2002 |
| Resolution L 299 Resolution Adopting LIOB Charter May 2, 2002 |
72192 bytes |
5/2/2002 |
| ALJ Ruling Gottstein Consolidates Utililty CARE Program Applications & Requests info & PHC Apr 26,02 |
40960 bytes |
4/26/2002 |
| Decision 02-04-049 Adopts Refrigerator Installation Standards and Errata to the WIS April 24,02 |
27648 bytes |
4/24/2002 |
| ACR Joint Peevey & Wood Review of Post 2002 Low Income Assistance Program for Southwest Gas and Other SMJU April 19,02 |
38912 bytes |
4/19/2002 |
| ACR Brown in Telephone Proceeding Requirement for Comments on Finders Fee &Auto Enrollment Apr 19,02 |
82944 bytes |
4/19/2002 |
| ALJ Ruling Gottstein Requiring Additional Info in Monthly Report April 19,02 |
47104 bytes |
4/19/2002 |
| ACR Wood Reopens Application Period for LIOB April 12,02 |
33280 bytes |
4/12/2002 |
| ACR Wood CARE Program Funding for 2002 March 29,02 |
33792 bytes |
3/29/2002 |
| ALJ Ruling Gottstein Request for Comments on Errata to WIS March 21,02 |
36352 bytes |
3/21/2002 |
| ACR Post 2001 Low Income Assistance Program Planning Feb 27,02 |
45056 bytes |
2/27/2002 |
| ACR & ALJ Scoping Memo for Phase 2 Baseline Proceeding Feb 26,02 |
55296 bytes |
2/26/2002 |
| ACR Wood LIEE Phase 3 Budget Augmentation & Revised Phase 4 Project Workplan Feb 19,02 |
139264 bytes |
2/19/2002 |
| Dec ision 02-02-026 Interim Opinion Addressing Petitions for Modification of D.01-03-073, Self-Generation Incentives |
74752 bytes |
2/7/2002 |
| ACR Wood Extends LIOB Applications Due Date Jan 18,02 |
45056 bytes |
1/18/2002 |
| ACR Wood CARE Penetration Rates Workshops Jan 14,02 |
40960 bytes |
1/14/2002 |
| Decision 02-01-048 Order Correcting Error in Dec 01-12-020 Jan 14,02 |
22528 bytes |
1/14/2002 |
| Decision 02-01-040 Eligibility Criteria & Rate Discount Level for LI Programs |
60416 bytes |
1/9/2002 |
| ALJ Ruling Gottsteing Notice of Status Conference & PHC Jan 7,02 |
38400 bytes |
1/7/2002 |
| Low Inconme EE Standardization and Calculations for Bll Savings and RRM |
396288 bytes |
12/14/2001 |
| Assigned Ruling Phase 4 |
140288 bytes |
12/14/2001 |
| Dec 01-12-020 Low Income Energy Efficiency Standardization Project Phase 3 Calculations for Bill Savings&RRM Phase2 |
359424 bytes |
12/12/2001 |
| Decision 02-12-011 Interim SMJU for PY 2003 |
37376 bytes |
12/6/2001 |
| Supplemental Cover Letter G-3328 |
74752 bytes |
11/16/2001 |
| PGE CARE App Resolution |
1035776 bytes |
11/16/2001 |
| ED SMJU Report 10-19-01 |
94208 bytes |
11/1/2001 |
| Joint ACR re Electronic Filing of Comments and Reply Comments |
32768 bytes |
6/25/2001 |
| ALJ Gottsteins Ruling and Notice of Status Conference on Rapid Deployment |
36352 bytes |
6/25/2001 |
| D 0106035 Waste Heat Recovery and Reliability Standards |
56832 bytes |
6/25/2001 |
| ALJ Ruling Requesting Comments on Mod of Low Income Ass Program |
39424 bytes |
6/25/2001 |
| Interim Opinion Waste Heat Recovery and Reliability |
56832 bytes |
6/25/2001 |
| ALJ Ruling on on Filing Procedures to implement AB X1 3 |
37888 bytes |
6/18/2001 |
| Joint ACR on Automatic Enrollment in CARE and LIEE |
35328 bytes |
6/18/2001 |
| Decision 01-06-010 Eligibility Criteria and Rate Discount Level |
77824 bytes |
6/12/2001 |
| ACR on Low Income Energy Efficiency Standardization Project |
71680 bytes |
6/12/2001 |
| ACR Wood PY 2002 Scoping Memo dated May 30 2002 |
34304 bytes |
5/30/2001 |
| D0105033 Re: Rapid Deployment of Low-Income - Signed May 3, 2001 |
232960 bytes |
5/7/2001 |
| Attachment 1-3 on the Draft Decision dated April 24, 2001 |
54784 bytes |
4/24/2001 |
| Attments 4 on the Draft Decision dated April 24, 2001 |
50176 bytes |
4/24/2001 |
| Attachment 5 on the Draft Decision dated April 24, 2001 |
22528 bytes |
4/24/2001 |
| Draft Decision re Rapid Deployment of Low-Income Assistance Program |
246784 bytes |
4/24/2001 |
| A0011009-et-al-R9807037-Gottstein Ruling |
46080 bytes |
4/4/2001 |
| Final Decision on Phase II Signed March 15, 2001 |
354304 bytes |
4/2/2001 |
| Decision 01-03-083 Rate Increases signed March 27, 2001 |
248832 bytes |
3/29/2001 |
| DRAFT Decision on Load Control |
153088 bytes |
3/5/2001 |
| ALJ Ruling on Scope and Scheduel for Post 2001 |
32256 bytes |
3/5/2001 |
| ACR Applying Article 2.5, SB 960 |
42496 bytes |
3/5/2001 |
| ACR on Implementation of PU Code Section 399-15 Load Control |
150528 bytes |
2/5/2001 |
| ACR on CARE Forms for PG&E Dated 1-30-01 |
27648 bytes |
1/30/2001 |
| R9807037 Gottstein Ruling Re Pay for Measured Savings Pilot Project |
29184 bytes |
1/18/2001 |
| A0011009 Gottstein Ruling Re Joint Prehearing Conference on Low Income Assistance Program to Address PY 2001 compliance issues and PY 2002 Program Pla |
44544 bytes |
1/18/2001 |
| Resolution G3303 Adopting Gas Public Purpose Program Surcharge rates as directed by AB 1002 |
73728 bytes |
12/26/2000 |
| R9807037 Gottstein Ruling regarding Pay for Measured Savings Pilot Workshop Report |
33792 bytes |
12/26/2000 |
| A9907002_ETAL_Gottstein_Ruling_a-o 12-22-00 |
32768 bytes |
12/22/2000 |
| Draft Decision on Low Income/Energy Efficiency Phase II Standardization Project |
394752 bytes |
12/19/2000 |
| Cover Letter of the Draft Decision on Low Income/Energy Efficiency Phase II |
43008 bytes |
12/19/2000 |
| ALJ Ruling on Standardization Project Phase II |
31232 bytes |
11/8/2000 |
| Reply Comments on the Joint Utilitiy on Low Income Weatherization |
69120 bytes |
11/8/2000 |
| ALJ Gottstein Ruling Oct 17 |
24064 bytes |
10/25/2000 |
| D 00-09-036 Sept 19&20, 2000 |
195584 bytes |
10/2/2000 |
| ACR Regarding Joint Utility Weatherization Installation Manual |
27648 bytes |
10/2/2000 |
| ACR Sept 11, 2000 Weatherization Installation Standards |
27648 bytes |
9/12/2000 |
| Final Decision on the Low-Income Assistance Program Policies for PY 2001 |
199680 bytes |
9/11/2000 |
| Decision 00-07-017 |
896512 bytes |
8/31/2000 |
| Resolution E-3699 |
58880 bytes |
8/24/2000 |
| Decision 00-08-037 Bill Stabilization Plan for SDG&E |
92160 bytes |
8/24/2000 |
| Proposed Decision on Low Income Assistance Program Policies for PY 2001 and Standardization Project Phase I |
186880 bytes |
8/7/2000 |
| Public Participation in the Joint Utility Policy and Procedures Standardization Project |
26112 bytes |
7/17/2000 |
| Final Decision on Program Year 2000 - Low Income Assistance Programs |
337920 bytes |
7/12/2000 |
| Assigned Commissioner's Ruling Regarding Program Year 2000- 2001 Planning |
38400 bytes |
6/14/2000 |
| Low Income Advisory Board Budget PY 2000 |
41984 bytes |
6/13/2000 |
| ALJ Ruling Regarding Comments and Replies to Filings |
34816 bytes |
5/24/2000 |
| ACR Regarding Standardization of Reporting Requirements and Utility Administrative Costs for Low-Income Assistance Programs |
37376 bytes |
5/4/2000 |
| Proposed Decision in A.99-07-002 4-18-00 Final Opinion on PY 2000 Low-Income Assistance Programs |
340480 bytes |
4/19/2000 |
| Proposed Decision Cover Letter in A.99-07-002 ALJ Gottstein |
43008 bytes |
4/19/2000 |
| A.99-07-002: Reply of PG&E to SESCO's Response to PG&E Motion to Take LIEE Administration In-House |
37888 bytes |
4/13/2000 |
| Final ACR on Joint Utility WIS and PP&O Manual Standardization Project |
29696 bytes |
3/24/2000 |
| D.00-03-026 Order Correcting Errors In Decision (D.) 00-02-045 |
71680 bytes |
3/10/2000 |
| Final R98-07-037 Assigned Commissioner's Ruling (ACR) Requesting Information from PG&E |
26624 bytes |
3/10/2000 |
| Administrative Law Judges's Ruling Regarding Motions to Strike |
57856 bytes |
3/9/2000 |
| D.00-02-045 Interim Decision: Structure & Operating Procedures of CPUC's Oversight of Energy Efficiency & Low-Income Programs |
188928 bytes |
2/23/2000 |
| 2ND Draft Needs Assessment Resolution - E3646 |
94208 bytes |
1/25/2000 |
| 1ST Draft Needs Assessment Resolution E-3646 |
96256 bytes |
1/25/2000 |
| 01-20-00 Alternate on the Boards, Commissioner Lynch |
60928 bytes |
1/25/2000 |
| Final R98-07-037 12-29-99 ACR on Standardization_ |
27648 bytes |
12/30/1999 |
| 12/21/99 Cover Letter, Alternate Proposed Decision |
41472 bytes |
12/27/1999 |
| 122199 Draft Alternate Proposed Decision on the Boards |
80384 bytes |
12/22/1999 |
| ALJ Ruling November 22, 1999 |
37888 bytes |
11/23/1999 |
| ALJ Ruling for A.99-07-002 |
27648 bytes |
10/15/1999 |
| Draft Decision R.98-07-037 |
240640 bytes |
9/10/1999 |
| ASSIGNED COMMISSIONER’S SCOPING MEMO AND RULING FOR LOW-INCOME PY2000 PROGRAM APPLICATIONS |
38400 bytes |
9/3/1999 |
| 8/6/99 ALJ Ruling Changing Date for PreHearing Conference |
23552 bytes |
8/20/1999 |
| Resolution E-3601 dated 5-27-99 |
204288 bytes |
5/27/1999 |
| LIGB Comments on E-3601 dated 5-14-99 |
25088 bytes |
5/14/1999 |
| 04/16/99 ACR Regarding Proposed Decision: Administration of Energy Efficiency and Low-Income Assistance Programs |
30208 bytes |
4/23/1999 |
| 03/18/99 Decision 99-03-056 - Proposed Decision: Administration of Energy Efficiency and Low-Income Assistance Programs |
86528 bytes |
3/29/1999 |
| 03/08/99 Assigned Commissioner's Ruling |
14848 bytes |
3/9/1999 |
| 02/23/99 ALJ Gottstein's Ruling Correcting Error |
13312 bytes |
2/23/1999 |
| 02/22/99 ALJ Gottstein's Ruling |
15360 bytes |
2/23/1999 |
| Revised Draft Proposed Decision for 2-18-99 CPUC Meeting |
87552 bytes |
2/10/1999 |
| DRAFT PROPOSED DECISION: ADMINISTRATION OF ENERGY EFFICIENCY AND LOW-INCOME ASSISTANCE PROGRAMS |
85504 bytes |
1/25/1999 |
| AC Ruling Order Instituting Rulemaking on the Commission's Proposed Policies and Programs Governing Energy Efficiency, Low Income Assistance, Renewabl |
18432 bytes |
10/6/1998 |
| ASSIGNED COMMISSIONER'S RULING ON INTERIM UTILITY ADMINISTRATION PERIOD AND APPLYING ARTICLE 2.5, SB 960 RULES AND PROCEDURES |
31232 bytes |
9/24/1998 |
| DRAFT 2/4/98 CPUC Decision - Interim Opinion: Board Compliance Filings |
32128 bytes |
2/4/1998 |
| Draft Decision on Low Income/Energy Efficiency Phase II Standardization Project |
394752 bytes |
12/19/1997 |
| D.97-05-041 (May 6, 1997): Interim opinion clarifying decision D.97-04-044 and adopting procedures to provide staff resources and initial funding for |
21018 bytes |
10/3/1997 |
| Revised ALJ Ruling: Revised Milestones for Implementation of D.07-02-014 (May 28, 1997) |
13180 bytes |
10/3/1997 |
| ALJ Ruling: Implementation of D.07-02-014 (March 19, 1997): Milestones for Implementing D.97-02-014. |
13504 bytes |
10/3/1997 |
| D.97-02-014 (February 5, 1997): Interim Opinion on Public Purpose Programs -- Threshold Issues. |
155659 bytes |
10/3/1997 |
| D.95-12-063 (December 20, 1995): The CPUC decision regarding restructuring of the California electric utility industry. |
2580 bytes |
10/3/1997 |
| Decision 97-09-117 |
290816 bytes |
9/30/1997 |
| ALJ Ruling on October 21, 1997 Implementation Work |
54784 bytes |
9/30/1997 |
|